Capital Construction

Construction planned:
- self-lifting drilling rig “Arkticheskya”
- fuel ship
- two semi submersible drilling units of the 6th generation for drilling exploration and development wells at the arctic shelf
- three supply ships for semi submersible drilling units – supply ships and drilling and development platforms brigades’ transportation
- two gas carrier ships with load-carrying ability 155 thousand cubic meters for LNG logistics
- two gas carrier ships with load-carrying ability 215 thousand cubic meters for LNG logistics
- two convoy tugs for proving path of gas carriers to terminals
- two docking tugs for mooring works with gas carriers and carrying ASD and Oil Spill Emergency Plan duties near export terminals
- service boat for vessel escort
- oil garbage disposal vessel for gathering scavenge oil, bilge water and garbage
- supply boats for carrying out tug works, weighing anchor, supplying drilling units, including DST “Obsky-1”
- transportable ice-strengthened drilling unit for year round geologic exploration and fields developing at shallow-water shelf of the Arctic seas
- two supply boats for transportable ice-strengthened drilling unit
- pusher tug for harbor and inspection works
- passenger ship for development and drilling platforms crews’ transportation
- diving boat for underwater technical works
- two supply boats for self-lifting drilling rig “Arkticheskya”
- supply boats for ASD and Oil Spill Emergency Plan at “Arkticheskya” self-lifting drilling rig
- ice- strengthened diving platform “Lastochka” for year round utilization with self-lifting drilling rig “Arkticheskya”